Transfer Chute and Trolley Upgrade

In order to facilitate a higher production rate, a new larger chute was required on one of our clients transfer stations and with the extra weight a heavier duty maintenance trolley needed to be designed and installed.

With our fabricators in Perth producing the trolley, handrails and lead out box and our Port Hedland workshop team manufacturing the wheels, pins and bushes, we stripped the old chute assembly out, welded in structural stiffeners and upgrade the whole transfer station to the new engineered requirements for its targeted higher run rate.

Share:

Facebook
Twitter
Pinterest
LinkedIn
Related Projects

Free Download

Download our free Capability Statement and discover the essential details that Inline Engineering Services can offer!

Thank You

Thank You for Downloading our Capability Statement. Your free download of the Inline Engineering Services Capability Statement has been emailed to you.

You can also click here to get your copy.