Assembly of epicyclic plantetary bucket wheel reclaimer gearbox
David Brown B3SS-560 before overhaul
David Brown B3SS-560 after overhaul with modifications to oil flows and temperature monitoring system added
Inline onsite for Thyssenkrupp bucket whell reclaimer gearbox inspection
Installation of reclaimer gearbox on site
Long term storage preparations managed by IES
Primary long travel drive before overhaul
Primary long travel drive after overhaul
Reinstallation of bucket wheel reclaimer gearbox on site
The Company
Services
Customers
Employment Opportunities
Contact Us
Home